BLOG
Field notes
on running AI at every site.
What it actually takes to run AI at customer sites and on infrastructure you control: model rollout, sizing, deployment, and the operational work that starts after the demo. Written from hands-on practice, not by marketers.
How to Roll Out a New AI Model to Every Customer Site Without Breaking One
Seven practices for shipping a new model version to every customer site: a version map of what runs where, signed releases, GPU capacity checks, waves behind a health gate, shadow tests on each site's data, automatic rollback, and offline sites.
Deplero Team
ReadShadow-Testing a Vision Model on Live Site Data Before It Goes Live
A model that passed every lab test can still fail at one site. How to run a new vision model in shadow beside the current one on each site's live data, what to compare, how to set the pass bar, and what to do when it fails.
Deplero Team
ReadWhy Device Update Tools Don't Manage Model Releases
Over-the-air and fleet tools keep devices healthy. A model release needs more: model-level versions, device compatibility, evaluation on site data, rollout by site, whole-bundle rollback and per-site data rules.
Deplero Team
ReadWhy On-Prem AI Is More Than a Helm Chart
A Helm chart on top of someone else's Kubernetes cluster is roughly 15% of an on-prem AI deployment. The other 85% (bare-metal provisioning, GPU drivers, NCCL tuning, MIG partitioning, signed artifacts, multi-tenant fairness) is where most vendors quietly stop, and where the customer's team absorbs a year of unbudgeted work.
Deplero Team
ReadHow to Size GPU Hardware for Enterprise LLM Inference
GPU sizing for LLM inference follows a deterministic formula. We walk through the VRAM equation, quantization tradeoffs (FP16 vs FP8 vs INT4), concurrency planning with vLLM, and a practical sizing table for Llama 3.1 70B, Qwen 3 14B, and Gemma 4 27B across A100, H100, A10G, and L40S GPUs.
Deplero Team
ReadOn-Prem vs Cloud AI: How to Decide Where Your Models Run
Three forces are pulling inference back onto infrastructure companies control: data that can't leave, per-token bills that scale with headcount, and vendor terms nobody reviewed. A practical comparison across control, operational burden, and five-year cost, including when the cloud is still the right answer.
Deplero Team
Read7 Best Practices for Deploying On-Premise AI in 2026
From signed supply chains to GPU right-sizing, these seven practices take a team from "we bought GPUs" to a production inference service in weeks instead of quarters. Practical guidance for the people who have to run it afterward.
Deplero Team
ReadWORKING ON THIS?
Talk to an engineer
If you're sizing hardware, planning a GPU deployment, or trying to get more out of GPUs you already own, a 30-minute technical call is usually faster than another week of research.
Book a demo